Altındağ (İzmir Metro)
From The Right Wiki
Jump to navigationJump to search
Altındağ | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
İzmir Metro rapid transit station | ||||||||||||||||
File:Altindag station location.jpg | ||||||||||||||||
General information | ||||||||||||||||
Location | Kamil Tunca Cd., Yeşilova Mah., 35080 Bornova | |||||||||||||||
Coordinates | 38°25′46″N 27°12′11″E / 38.4294°N 27.2030°E | |||||||||||||||
Owned by | İzmir Metropolitan Municipality | |||||||||||||||
Operated by | İzmir Metro A.Ş. | |||||||||||||||
Line(s) | ||||||||||||||||
Platforms | 1 island platform | |||||||||||||||
Tracks | 2 | |||||||||||||||
Construction | ||||||||||||||||
Accessible | Yes | |||||||||||||||
History | ||||||||||||||||
Opened | 2020 (Expected) | |||||||||||||||
Services | ||||||||||||||||
|
Altındağ is a proposed underground station on the M5 Line of the İzmir Metro. It will be located beneath Kamil Tunca Avenue in the southern Bornova. Construction of the station, along with the metro line, is scheduled to begin in 2018. Altındağ station is expected to open in 2020.[1][2][needs update]
References
- ↑ "Halkapınar-Otogar Metro Projesi'nin ÇED süreci tamamlandı". ensonhaber.com (in Turkish). 1 June 2017. Retrieved 24 December 2017.
{{cite web}}
: CS1 maint: unrecognized language (link) - ↑ Yılmaz, Mustafa (15 May 2017). "Otogara 30 ay sonra metro". milliyet.com.tr (in Turkish). Retrieved 24 December 2017.
{{cite web}}
: CS1 maint: unrecognized language (link)