D6 motorway (Czech Republic)

From The Right Wiki
Jump to navigationJump to search
D6 Motorway
Dálnice D6
<mapframe>: The JSON content is not valid GeoJSON+simplestyle. The list below shows all attempts to interpret it according to the JSON Schema. Not all are errors.
  • /0/query: The property query is required
  • /0/ids: The property ids is required
  • /0: Failed to match at least one schema
  • /0/title: The property title is required
  • /0/service: Does not have a value in the enumeration ["page"]
  • /0: Failed to match exactly one schema
  • /0/geometries: The property geometries is required
  • /0/type: Does not have a value in the enumeration ["GeometryCollection"]
  • /0/type: Does not have a value in the enumeration ["MultiPolygon"]
  • /0/type: Does not have a value in the enumeration ["Point"]
  • /0/type: Does not have a value in the enumeration ["MultiPoint"]
  • /0/type: Does not have a value in the enumeration ["LineString"]
  • /0/type: Does not have a value in the enumeration ["MultiLineString"]
  • /0/type: Does not have a value in the enumeration ["Polygon"]
  • /0/coordinates: The property coordinates is required
  • /0/geometry: The property geometry is required
  • /0/type: Does not have a value in the enumeration ["Feature"]
  • /0/features: The property features is required
  • /0/type: Does not have a value in the enumeration ["FeatureCollection"]
Route information
Part of File:CZ traffic sign IS17 - E48.svg E48File:CZ traffic sign IS17 - E49.svg E49
Length97 km (60 mi)
Planned: 169 km (105 mi)
Major junctions
FromFile:CZ traffic sign IS16a - D0.svg D0 in Prague
ToFile:Bundesstraße 303 number.svg B303 border with Germany
Location
CountryCzech Republic
RegionsPraha, Central Bohemian, Ústí nad Labem, Karlovy Vary
Major citiesPraha, Karlovy Vary, Cheb
Highway system

D6 motorway (Czech: Dálnice D6), formerly Expressway R6 (Czech: Rychlostní silnice R6) is a highway in the Czech Republic. When completed it will go from Prague through Karlovy Vary and Cheb to the border with Germany. Its first segment was opened in 1980s. As of December 2020 100 km (62 mi) of the highway is in operation. Another 4.86 km (3.02 mi) is under construction.

Under construction

Section Length Start of construction Completion
Krupá relocation 6,45 km 02/2022 planned 2024
Hořesedly relocation 9,2 km 02/2023 planned 2025
Hořovičky bypass 5,19 km 03/2023 planned 2025