Dorobanțu Wind Farm

From The Right Wiki
(Redirected from Dorobanţu Wind Farm)
Jump to navigationJump to search

Dorobanţu Wind Farm
CountryRomania
LocationDorobanțu, Constanța County
StatusOperational
Construction began2010
Commission date2011
Construction cost€90 million
OwnerPetrom
Wind farm
TypeOnshore
Power generation
Nameplate capacity45 MW
Annual net output120 GWh

The Dorobanțu Wind Farm is wind farm located in Constanța County, Romania. It has 15 Vestas-V90 wind turbines with a nominal output of around 3 MW each.[1] It delivers up to 45 MW of power, enough to power over 30,000 homes, which required a capital investment of approximately €90 million.[2]

References

  1. "Petrom's EUR 90 mln Dorobantu wind park in Romania becomes functional". Romania Business Insider. 6 October 2011. Retrieved 19 March 2012.
  2. "Din ce mai fac bani petroliştii? Petrom a scos primul milion de euro din vânt" (in Romanian). Ziarul Financiar. 3 January 2012. Retrieved 3 January 2012.{{cite web}}: CS1 maint: unrecognized language (link)