Cibubur Line
File:Jakarta LRT CB.svg
Trial run at Harjamukti Station
Overview
Other name(s)Service line 1 of LRT Jabodebek (working name)
Native nameLin Cibubur
StatusOperational
OwnerMinistry of Transportation
LocaleJakarta, West Java
Termini
Stations19 (12 operational, 7 planned)
Service
TypeLight rapid transit
SystemJabodebek LRT
Services1
Operator(s)Kereta Api Indonesia
Depot(s)Jatimulya
History
OpenedAugust 28, 2023 (2023-08-28)[1]
Completed2022 [2]
Technical
Line length25.94 km (16.12 mi)
Number of tracks2
CharacterElevated
Track gauge1,435 mm (4 ft 8+12 in) standard gauge
Electrification750 V DC Third rail system
Route map

planned extension to Senayan
DA
Dukuh Atas BNI File:Jakarta LRT BK.svg File:BSicon BUS3.svg
ST
Setiabudi File:Jakarta LRT BK.svg File:BSicon BUS3.svg
RS
Rasuna Said File:Jakarta LRT BK.svg File:BSicon BUS3.svg
KN
Kuningan File:Jakarta LRT BK.svg File:BSicon BUS3.svg
PC
Pancoran Bank BJB File:Jakarta LRT BK.svg File:BSicon BUS3.svg
CK
Cikoko File:Jakarta LRT BK.svg File:BSicon BUS3.svg
CL
Ciliwung File:Jakarta LRT BK.svg File:BSicon BUS3.svg
CW
Cawang File:Jakarta LRT BK.svg File:BSicon BUS3.svg
TM
TMII File:BSicon BUS3.svg
Jagorawi Toll Road│JORR
KR
Kampung Rambutan File:BSicon BUS2.svg File:BSicon BUS3.svg
CI
Ciracas
HM
Harjamukti
planned extension to Baranangsiang

The Jabodebek LRT Cibubur Line (Indonesian: LRT Jabodebek Lin Cibubur) is one of the two light rapid lines of the Jabodebek LRT which connect Dukuh Atas to Harjamukti station, which is about 25.94 km in length. The line adopts elevated construction and stops at twelve stations. Its Pancoran–Harjamukti section runs along the Jakarta Inner Ring Road and Jagorawi Toll Road. The planned next phase would extend the line to Bogor.[3]

History

File:Jakarta-Bogor-Ciawi (JBC) Toll Road (Jalan Tol 2), August 2019 (8).jpg
The elevated route is built parallel with the Jagorawi Toll Road.

Like other public transportation systems in Jabodetabek area, the Jabodebek LRT system was built to break down congestion. The construction of the Cawang–Cibubur LRT Line and other lines in the first phase of the Jabodebek LRT construction began with the groundbreaking on 9 September 2015 by President Joko Widodo. It was carried out near the planned TMII Station which is a part of this route.[4] Initially the phase 1 was targeted to be completed before the 2018 Asian Games. However, until the Asian Games were held, the overall progress was still 45%. Even so, at the time the Cawang–Cibubur route had already begun to be installed with rails.[5] In March 2019, the entire track has been connected. All elevated construction work has been completed and continued with signaling and station construction. Therefore, the line is estimated to be ready for the trial run considering that the other lines have not yet completed their track construction.[6][7] On October 11, 2019, the first train of Jabodebek LRT arrived in Jakarta. The shipment was carried out by land directly from INKA factory in Madiun, East Java. For the time being, the train has been parked near Harjamukti Station; considering that the LRT depot construction in Jatimulya, Bekasi has not yet been completed.[8][9] In October 2020, the Jabodebek LRT trains began their trials. The trial was carried out on the Cawang–Cibubur route from TMII Station to Harjamukti Station. It was conducted to check signal and track readiness.[10][11]

Network

Route

The Cibubur Line has a track length of 25.94 kilometers.[12] Most of the trajectory of this route is using an elevated structure. From Dukuh Atas to Cawang, this line shares the route with Bekasi Line, goes along Jalan Rasuna Said then turns to the south side of the Jakarta Inner Ring Road (Cawang–Pluit section). In Cawang Station, the two lines split and the line follows the Jagorawi Toll Road alignment.[13] In a section from Cawang Station to TMII Station, the route follows the east side of the toll road; tracks are made at grade because it is close to the approach zone of Halim Perdanakusuma Airport. After TMII Station, the route moves to the west side until its terminus at Harjamukti Station.[14] The track ends at Harjamukti as a pit stop, although all trains of the system have their depot in Jatimulya, part of the Bekasi Line.

List of stations

File:Jakarta LRT CB.svg Station Transfer/Notes Location
Number Name City/Regency Province
Phase 1: Cibubur–Dukuh Atas
CB01 BK01 Dukuh Atas BNI File:Jakarta LRT BK.svg Terminus station.

File:Jakarta - MRT Jakarta North South Line Icon.svg Dukuh Atas BNI File:Jakarta KRL C.svg Sudirman File:Jakarta KRL C.svg File:Jakarta KRL A.svg BNI City File:Jakarta LRT S.svg Halim (Planned) List of Transjakarta corridors#Corridor 1 List of TransJakarta corridors#Cross-corridor routes Dukuh Atas List of Transjakarta corridors#Corridor 4 List of TransJakarta corridors#Corridor 6 Galunggung

South Jakarta Jakarta
CB02 BK02 Setiabudi File:Jakarta LRT BK.svg List of Transjakarta corridors#Cross-corridor routes List of TransJakarta corridors#Corridor 6 List of TransJakarta corridors#Cross-corridor routes File:TransJakarta roundel L13E.png Setiabudi
CB03 BK03 Rasuna Said File:Jakarta LRT BK.svg List of Transjakarta corridors#Cross-corridor routes List of TransJakarta corridors#Corridor 6 List of TransJakarta corridors#Cross-corridor routes File:TransJakarta roundel L13E.png Rasuna Said
CB04 BK04 Kuningan File:Jakarta LRT BK.svg List of Transjakarta corridors#Cross-corridor routes List of TransJakarta corridors#Corridor 6 List of TransJakarta corridors#Cross-corridor routes File:TransJakarta roundel L13E.png Kuningan

(PT) Kuningan (Planned)

CB05 BK05 Pancoran Bank BJB File:Jakarta LRT BK.svg List of TransJakarta corridors#Corridor 9 List of TransJakarta corridors#Cross-corridor routes List of TransJakarta corridors#Cross-corridor routes File:TransJakarta roundel 13B.png Pancoran
CB06 BK06 Cikoko File:Jakarta LRT BK.svg File:Jakarta KRL B.svg Cawang

List of TransJakarta corridors#Corridor 9 List of TransJakarta corridors#Cross-corridor routes List of TransJakarta corridors#Cross-corridor routes Cikoko

CB07 BK07 Ciliwung File:Jakarta LRT BK.svg List of TransJakarta corridors#Corridor 9 List of TransJakarta corridors#Cross-corridor routes List of TransJakarta corridors#Cross-corridor routes Ciliwung East Jakarta
CB08 BK08 Cawang File:Jakarta LRT BK.svg

Interchange station to File:Jakarta LRT BK.svg List of Transjakarta corridors#Cross-corridor routes List of Transjakarta corridors#Cross-corridor routes List of TransJakarta corridors#Corridor 7 List of TransJakarta corridors#Corridor 9 List of TransJakarta corridors#Cross-corridor routes List of TransJakarta corridors#Cross-corridor routes List of TransJakarta corridors#Cross-corridor routes Cawang

CB09 TMII List of TransJakarta corridors#Corridor 9 List of TransJakarta corridors#Cross-corridor routes List of TransJakarta corridors#Cross-corridor routes Makasar

File:Bus-logo.svg Shuttle bus to Taman Mini Indonesia Indah.

CB10 Kampung Rambutan List of TransJakarta corridors#Corridor 7 File:TransJakarta roundel 7F.png File:TransJakarta roundel 10D.png Kampung Rambutan

Bus Terminal Kampung Rambutan Bus Terminal. File:Jakarta MRT Outer Loop Line.png Kampung Rambutan (planned)

CB11 Ciracas
CB12 Harjamukti Terminus station (phase 1).

 F01   F02  Stasiun LRT Harjamukti  K1  Stasiun LRT Harjamukti (DC) Harjamukti (planned)

Depok West Java
Phase 2: Cibubur–Bogor (under feasibility study)
Bojong Nangka Depok West Java
Gunung Putri Bogor Regency
Sirkuit Internasional Sentul
Sentul
Sukaraja (BG) Sukaraja (Planned) Bogor
Bogor (BG) Baranangsiang (Planned)

Future development

In the phase 2 plan, the Cibubur Line is to be extended to Bogor and Senayan.[15][16] The Cibubur-Bogor route is planned to be built at grade, instead of elevated like the Cawang–Cibubur route. This aims to save construction costs by up to 50%.[17] Until recently, it is still in the design planning process.[18][19]

Incidents

  • On October 25, 2021, two LRT trains had an accident while undergoing trials on Cibubur Line, parallel to the Jagorawi Toll Road.[20][21]

References

  1. "Cara Naik LRT Jabodebek yang Baru Diresmikan Jokowi Hari Ini". CNN Indonesia (in Bahasa Indonesia). August 28, 2023. Retrieved August 29, 2023.
  2. "Proyek LRT Jabodebek Molor ke 2022" (in Bahasa Indonesia). June 5, 2020. Retrieved June 27, 2020.
  3. Dewi Rina Cahyani (ed.). "Proyek LRT Cibubur - Bogor Ditargetkan Rampung 3 Tahun" (in Bahasa Indonesia). Retrieved November 11, 2019.
  4. "LRT JABODETABEK: Jokowi 'Groundbreaking' Hari Ini". Bisnis.com (in Bahasa Indonesia). September 9, 2015. Retrieved January 4, 2023.
  5. "Konstruksi Sipil LRT Jabodebek Rampung Akhir 2018". KOMPAS.com (in Bahasa Indonesia). August 21, 2018. Retrieved January 4, 2023.
  6. "Lintas Cawang-Cibubur Tersambung, Progres LRT Capai 60 Persen". CNN Indonesia (in Bahasa Indonesia). Retrieved January 4, 2023.
  7. Alhikam, Herdi Alif. "Fakta Jalur LRT Cibubur-Cawang Sudah Tersambung". detikfinance (in Bahasa Indonesia). Retrieved January 4, 2023.
  8. Lidyana, Vadhia. "Penampakan LRT Jabodebek yang Tiba di Jakarta". detikfinance (in Bahasa Indonesia). Retrieved January 4, 2023.
  9. "Fakta-Fakta Terbaru LRT Jabodebek, Termasuk Tarif Rp12.000 Semua Halaman". merdeka.com. October 15, 2019. Retrieved January 4, 2023.
  10. Anwar, Muhammad Choirul. "Uji Coba LRT Cibubur: Mulai Mondar-Mandir, Kapan Operasi?". CNBC Indonesia (in Bahasa Indonesia). Retrieved January 4, 2023.
  11. "Jam 2 Siang, Uji Coba LRT Jabodebek 4 kali Bolak-balik : Okezone Economy". Okezone (in Bahasa Indonesia). October 22, 2020. Retrieved January 4, 2023.
  12. Media, Kompas Cyber (July 27, 2019). "Panduan Lengkap LRT Jabodebek, Rute dan Stasiun". KOMPAS.com (in Bahasa Indonesia). Retrieved January 4, 2023.
  13. "Konstruksi Jalur LRT Berada di Sisi Kanan Tol Jagorawi". TEMPO.CO (in Bahasa Indonesia). October 21, 2015. Retrieved January 4, 2023.[permanent dead link]
  14. Aditiasari, Dana. "Cibubur-Cawang Terhubung LRT, Ini Jalurnya". detikfinance (in Bahasa Indonesia). Retrieved January 4, 2023.
  15. Aliya, Angga. "Ini Dia Rute-rute LRT Jokowi yang akan Dibangun Adhi Karya". detikfinance (in Bahasa Indonesia). Retrieved January 4, 2023.
  16. "Ini Rute LRT dari Bekasi, Bogor, Depok dan Jakarta". suara.com (in Bahasa Indonesia). September 9, 2015. Retrieved January 4, 2023.
  17. Pramisti, Nurul Qomariyah. "LRT Jabodebek Tahap 2 Arah Bogor Dibangun di Darat, Biaya Turun 50%". tirto.id (in Bahasa Indonesia). Retrieved January 4, 2023.
  18. "Pembangunan Lintas Rel Terpadu Tahap II Rampung dalam 3 Tahun". Bisnis.com (in Bahasa Indonesia). November 11, 2019. Retrieved January 4, 2023.
  19. Siregar, Efrem. "Kabar Gembira! LRT Cibubur-Sentul-Bogor Siap Dieksekusi". CNBC Indonesia (in Bahasa Indonesia). Retrieved January 4, 2023.
  20. "BREAKING NEWS: LRT Jabodetabek Tabrakan di Atas Ruas Tol Jagorawi Jakarta Timur". Tribunnews.com (in Bahasa Indonesia). Retrieved January 4, 2023.
  21. Liputan6.com (October 25, 2021). "LRT Jabodebek Tabrakan di Jalur Layang Cibubur, Adhi Karya Kirim Tim ke Lapangan". liputan6.com (in Bahasa Indonesia). Retrieved January 4, 2023.{{cite web}}: CS1 maint: numeric names: authors list (link)