Line 3 (Suzhou Rail Transit)
From The Right Wiki
(Redirected from Line 3, Suzhou Rail Transit)
Line 3 | |
---|---|
File:SZRT Line 3 icon.svg | |
File:PM102-0335.jpg | |
Overview | |
Status | In operation |
Owner | Suzhou Rail Transit Co., Ltd |
Termini | |
Stations | 37 |
Service | |
Type | Rapid transit |
System | Suzhou Rail Transit |
Operator(s) | Suzhou Rail Transit Co., Ltd |
History | |
Opened | 25 December 2019[1] |
Technical | |
Line length | 45.272 km (28.131 mi)[2] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Line 3 is an east-west line of Suzhou Rail Transit. The line is 45.272 kilometers long.[2] The line links the Wuzhong District, Suzhou Industrial Park, and the Suzhou New District. Line 3 started trial operations from December 6 to December 10, 2019.[3] Official operation started on December 25, 2019.[1]
Stations
Service routes
- Suzhou Xinqu Railway Station — Huaqiao (Line 11)
- Suzhou Xinqu Railway Station — Fengtingdadao, in rush hours
Through service
Through service between Line 3 and Line 11 started on December 23, 2023.[4] During 23 December 2023 and 29 June 2024, with through train to/from line 11, Gexiangjie and Weiting were only served by Line 11 trains.
Rolling stock
Fleet numbers | Year Built | Time in service | Builder | Class | Number in service | No of car |
Assembly | Rolling stock | Number | Depots | Line assigned | Notes |
---|---|---|---|---|---|---|---|---|---|---|---|---|
300 (50 sets) | 2017-2021 | 2018-2024 | CRRC Nanjing Puzhen | B | 60 (10 sets) | 6 | Tc+Mp+M - M + Mp+Tc | PM101 PM102 PM116 |
030101-035006 (0301-0350) |
Xushuguan Depot South Weiting Yard Songling Depot Yuanhe Yard Tian'Edang Yard |
4 | All cars will be converted to PM259 after the first overhaul and re-equipped to Line 7 by late 2024. Cars assigned to Line 3 service out of regular service since June 29, 2024 and removed from the service since September 28, 2024. |
300 (50 sets) | 2023-2025 | 2024-present | CRRC Nanjing Puzhen | B | 186 (31 sets) | 6 | Tc+Mp+M - M + Mp+Tc | PM247 | 030101-035006 (0301-0350) |
Xushuguan Depot South Weiting Yard Chaoyang Road Depot Huaqiao Yard |
3 11 |
Map
Gallery
-
An image of Exit 6b of Ligongdi West Station, under construction, taken a few weeks before the opening.
-
An image of Exit 2 of Ligongdi West Station, under construction, taken a few weeks before the opening.
References
- ↑ 1.0 1.1 "苏州轨道交通3号线明日(12月25日)11点30分开通". 2019-12-24.
- ↑ 2.0 2.1 "轨交3号线铺轨,预计2019年底试运营". 2018-01-10.
- ↑ "轨交3号线试乘首日迎来众多市民"打卡"". 2019-12-07.
此次"万人试乘"活动时间为12月6日至10日,为期5天。每天试乘时限为7:00至19:00
- ↑ "地铁S1线拟更名为11号线 预计2023年底与3号线贯通运营".