List of wind farms in Kosovo
From The Right Wiki
(Redirected from Wind power in Kosovo)
Largest projects
These are the most important wind farm projects in Kosovo (larger than 10 MW):
Project name | Sponsoring company | Installed capacity (MW) | Municipality | Status | Completed/ Notes |
---|---|---|---|---|---|
Kitka Wind Farm | GURIS HOLDING CO | 32.4 | Dardanë | Completed | [1] |
Bajgora Wind Farm | Sowi Kosova LLC | 102.6 | Mitrovicë | Completed | [2] |
Çiçavica Wind Farm | Akouo Energy | 100 | Vushtrri | Approved | [3] |
Koznica Wind Park | Prishtina Energy LLC | 34.5 | Artanë | Proposed | [4] |
Budakova Wind Park | Bondcom Energy Point LLC | 46 | Therandë | Proposed | [5] |
Zatriqi Wind Park | NEK Umwelttechnik AG | 45 | Pejë | Proposed | [6] |
Krajkova Wind Park | Era Energji | 21 | Drenas | Proposed | [7] |
Wind Farm Shtime | KL-Energy LLC | 80 | Shtime | Proposed | [8] |
Totals
Category status | Total capacity |
---|---|
Completed | 135 MW |
Under construction | 0 MW |
Approved | 100 MW |
Proposed | 226.5 MW |
All Stages | 461.5 MW |
References
- ↑ "Në Kikë të Kamenicës: Përurohet centrali i parë i energjisë me erë".
- ↑ "Bajgora Wind".
- ↑ "100 milionë euro investime në energji në Vushtrri".
- ↑ "Application/Request for Authorization for construction of new generation capacities for electricity generation from wind, HPP "Wind-Park-Koznica"," (PDF).
- ↑ "Budakova wind farm's developer inks supply deal with KOSTT".
- ↑ "Zviceranët, 240 milionë euro investim në energjinë e erës".
- ↑ "Review of the request of "Era Energji" sh.pk. company for extension of time limit of validity of the Decision n Notification for Preliminary Authorization, "Wind Park Krajkova" (PDF).
- ↑ "WIND FARM SHTIMJE" (PDF).