Aapua Wind Farm

From The Right Wiki
Jump to navigationJump to search
Aapua Wind Farm

The Aapua wind farm (Swedish: Aapua-parken) is a wind farm on Eta, southwest of Aapua, Övertorneå municipality in Norrbotten County, Sweden. As of 2007, it is the northernmost wind windfarm in Sweden.[1] The farm is owned by Aapua Vind AB, representing 14 private investors, and operates on land owned by the state-owned Sveaskog, Sweden's largest forest owner.[2] The farm became operational in 2005[3]

Technical

The farm consists of seven 1.5 MW Vestas V82-1.5 MW Arctic wind turbines[4] with a total stated power of 9.9 MW[2] (10.5 MW according to supplier Vestas[4]). Each unit has a nacelle height of 78 m and a rotor diameter of 82 m.[4]

See also

References

  1. Rothberg, Ole; Andersson, Mikael (2007-12-22). "Het vindkraft sätter snurr på det gamla varvet". Dagens nyheter (in Swedish). Stockholm. Archived from the original on 2007-08-15. Retrieved 2008-01-03.{{cite news}}: CS1 maint: unrecognized language (link)
  2. 2.0 2.1 "Rusning till Sveaskog efter bra vindkraftlägen - Ny Teknik". Archived from the original on 2011-06-08.
  3. "Placera Nu Sveaskog: Medvind för vindkraft i skogsmiljö". Archived from the original on 2011-07-19. Retrieved 2007-12-24.
  4. 4.0 4.1 4.2 "www.vestas.com/Admin/Public/DWSDownload.aspx?File=%2FFiles%2FFiler%2FSE%2FBrochures%2FAapua_SE.pdf" (PDF). Archived from the original (PDF) on 2009-07-06.