Georgia State Route 115
State Route 115 | ||||
---|---|---|---|---|
Route information | ||||
Maintained by GDOT | ||||
Length | 32.3 mi[1] (52.0 km) | |||
Major junctions | ||||
West end | File:US 19.svgFile:Georgia 60.svgFile:Georgia 400.svg US 19 / SR 60 / SR 400 south of Dahlonega | |||
File:US 129.svgFile:Georgia 11.svg US 129 / SR 11 in Cleveland | ||||
East end | File:US 441 Business.svgFile:Georgia 17.svgFile:Georgia 17 Alternate.svgFile:Georgia 197.svgFile:Georgia 385.svg US 441 Bus. / SR 17 / SR 17 Alt. / SR 197 / SR 385 in Clarkesville | |||
Location | ||||
Country | United States | |||
State | Georgia | |||
Counties | Lumpkin, White, Habersham | |||
Highway system | ||||
| ||||
|
State Route 115 (SR 115) is a 32.3-mile-long (52.0 km) state highway that runs west-to-east in the northeastern part of the U.S. state of Georgia. It travels through portions of Lumpkin, White, and Habersham counties.
Route description
This article needs to be updated.(May 2022) |
SR 115 begins just northeast of the Chestatee River at an intersection with US 19/SR 60 (South Chestatee Street), south of Dahlonega, in Lumpkin County. This intersection marks the northern terminus of SR 400. South of this intersection, US 19/SR 400 make up the Hospitality Highway, a freeway that provides access to Atlanta. It heads northeast to an intersection with SR 52, east of the town. The two routes run concurrent to the southeast for a little over1 mile (1.6 km). In a curving fashion, SR 115 heads northeast into White County and intersects with the western terminus of SR 284 (Shoal Creek Church Road). Then, it enters Cleveland, where it meets US 129/SR 11 (Main Street). On the eastern edge of the town is Truett-McConnell College. Just east of the town is an intersection with the western terminus of SR 255. To the southeast is SR 384 (Duncan Bridge Road). Immediately after is an intersection with the eastern terminus of SR 254. About0.5 miles (0.80 km) later, the route passes over the Chattahoochee River into Habersham County. To the northeast is an intersection with SR 105 (Cannon Bridge Road). Just before entering Clarkesville, Georgia is an intersection with the southern terminus of the SR 17 Connector and the beginning of a concurrency with SR 17 (Unicoi Turnpike). The two highways travel to the southeast until entering the town. Almost immediately, there is a crossing over the Soque River. They curve to the northeast until they intersect SR 197/SR 385 (Washington Street, which is part of the old route of US 441). At this intersection, SR 115 ends, and SR 17 heads south concurrent with SR 197/SR 385. The highway is mostly rural, except for the segments in Cleveland and Clarkesville. [1] All of SR 115 west of the intersection with SR 105 is part of the National Highway System, a system of roadways important to the nation's economy, defense, and mobility.[2]
Major intersections
County | Location | mi[1] | km | Destinations | Notes |
---|---|---|---|---|---|
Lumpkin | | 0.0 | 0.0 | File:US 19.svgFile:Georgia 60.svgFile:South plate.svg File:Georgia 400.svg US 19 / SR 60 (South Chestatee Street) / SR 400 south (Hospitality Parkway) – Dahlonega, Gainesville, Cumming | Western terminus; northern terminus of SR 400 |
| 4.8 | 7.7 | File:West plate.svg File:Georgia 52.svg SR 52 west – Dahlonega | Western end of SR 52 concurrency | |
| 6.8 | 10.9 | File:East plate.svg File:Georgia 52.svg SR 52 east | Eastern end of SR 52 concurrency | |
White | | 11.8 | 19.0 | File:East plate.svg File:Georgia 284.svg SR 284 east (Shoal Creek Church Road) – Clermont | Western terminus of SR 284 |
Cleveland | 17.5 | 28.2 | File:US 129.svgFile:Georgia 11.svg US 129 / SR 11 (Main Street) – Clermont | ||
| 20.2 | 32.5 | File:East plate.svg File:Georgia 255.svg SR 255 east | Western terminus of SR 255 | |
| 23.7 | 38.1 | File:Georgia 384.svg SR 384 (Duncan Bridge Road) – Baldwin, Helen | ||
| 24.8 | 39.9 | File:West plate.svg File:Georgia 254.svg SR 254 west – Clermont | Eastern terminus of SR 254 | |
Chattahoochee River | 25.2 | 40.6 | Unnamed bridge; crossing over the Chattahoochee River, marking the White–Habersham county line | ||
Habersham | | 26.5 | 42.6 | File:Georgia 105.svg SR 105 – Demorest | |
| 30.4 | 48.9 | File:North plate.svg File:Georgia 17.svg SR 17 north – Helen | Western end of SR 17 concurrency | |
Clarkesville | 31.8 | 51.2 | Unnamed bridge | Crossing over the Soque River | |
32.3 | 52.0 | File:US 441 Business.svgFile:South plate.svg File:Georgia 17.svgFile:South plate.svg File:Georgia 17 Alternate.svgFile:Georgia 197.svgFile:Georgia 385.svg US 441 Bus. / SR 17 south / SR 17 Alt. south / SR 197 / SR 385 (Washington Street) – Mount Airy, Demorest | Eastern terminus; northern terminus of SR 17 Alt.; eastern end of SR 17 concurrency | ||
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
|
See also
References
- ↑ 1.0 1.1 1.2 "Route of SR 115" (Map). Google Maps. Retrieved July 12, 2013.
- ↑ "National Highway System: Georgia" (PDF). United States Department of Transportation. October 1, 2012. Retrieved July 12, 2013.