SITVA

From The Right Wiki
Jump to navigationJump to search
SITVA
Train near Berrío Park station
Overview
OwnerDepartment of Antioquia, Medellín City
Area servedAburrá Valley
LocaleMedellín Metropolitan Area, Antioquia, Colombia
Transit type
  • Rapid transit
  • Cable car
  • Translohr
  • Bus rapid transit
  • Bicycle-sharing system
Number of lines12[1]
Line numberLine A (Níquia-La Estrella)

Line B (San Antonio-San Javier) Line K (Acevedo-Santo Domingo) Line J (San Javier-La Aurora) Line L (Santo Domingo-Arví) Line H (Oriente-Villa Sierra) Line M (Miraflores-Trece de Noviembre) Line P (Acevedo-El Progreso) Line 1 (U. de M.-Parque Aranjuez/Ferrocarril Ave.) Line 2 (U. de M.-Parque Aranjuez/Oriental Ave.) Line 3 (South Corridor) (under construction) Line T (San Antonio-Oriente)

Line O (Caribe-La Palma)
Number of stations
  • 65 stations
  • 48 stops[2]
Daily ridership0.53 million (weekday 2020)[3]
Annual ridership328 million (2021)[4]
WebsiteSITVA
Operation
Number of vehicles
  • 80 trains (3 cars per train)
  • 498 gondolas
  • 31 articulated buses (30 natural gas + 1 electric)
  • 111 feeding buses (47 natural gas + 64 electric)
  • 12 Translohr[2]
Technical
System length85.12 km (52.9 mi)[2]
System map
SITVA map
SITVA map

SITVA (Sistema Integrado de Transporte del Valle de Aburrá in Spanish or Aburrá Valley Integrated Transport System) is the public transportation system of Medellín and its metropolitan area. It allows people from the Metropolitan Area of Medellín to move across the ten Aburrá Valley municipalities using different transport modes. It uses integrated fares and a single payment card (Cívica card).

Components

SITVA includes the Medellín Metro, currently comprising two lines: Line A, which is 25.8 kilometres (16.0 mi) long and serves 21 stations, and Line B, which is 5.5 kilometres (3.4 mi) long and serves 6 stations (plus San Antonio station, the transfer station with Line A). There is also a tram line: Line T (Ayacucho Tram).[2][1] Additionally, the aerial cable car system, Metrocable, which supplements the metro system, comprises six lines: Line J with 3 stations (plus one transfer station with Metro Line B),[1][2] Line K with 3 stations (plus one transfer station with Metro Line A and one with Line L),[2][1] Line L with one station (plus one transfer station with Line K), Line H with two stations (plus one transfer station with Line T), Line M with two stations (plus one transfer station with Line T) and Line P with 3 stations (plus one transfer station with Metro Line A).[1] SITVA also integrates a bus rapid transit system (Metroplús [es]), a minibus network called Sistema Integrado de Transporte (SIT) in Spanish and a bicycle-sharing system (EnCicla). As of 2022, there are 27 metro stations, 15 Metrocable stations, 3 tramway stations (+ 6 tram stops), 20 BRT stations (+ 42 feeding bus stops) in the SITVA network, all listed in the following table; for a total of 65 stations and 48 stops. Transfer stations are in bold, and the transfer station between metro lines A and B is shown in bold-italic:

Name Stations Date of opening Fleet Commercial speed Capacity (per vehicle) Capacity (passengers/h-direction) Travel time one journey Top frequency (rush hour)
Metro services
File:Línea A (Logo Metro de Medellín).svg
Line A

North to South
25.8 km (16.0 mi)[2]
21 stations[1]

30 November 1995 80 three-car trains; for a total of 240 cars 40 km/h (25 mph); max. speed 80 km/h (50 mph) 300 users per car 41,480 42 minutes 3 minutes
File:Línea B (Logo Metro de Medellín).svg

Line B
Center to West
5.5 km (3.4 mi)[2]
7 stations[1]

29 February 1996 16,231 10.5 minutes 3:50 minutes
Metrocable services
File:Línea K (Logo Metro de Medellín).svg

Line K
North to Northeast
2.07 km (1.29 mi)[2]
4 stations[1]

7 August 2004 93 gondolas 18 km/h (11 mph) 8 users sitting, 2 standing; for a total of 10 users per gondola 3,000 9 minutes 0:12 minutes
File:Línea J (Logo Metro de Medellín).svg

Line J
West to North
2.7 km (1.7 mi)[2]
4 stations[1]

3 March 2008 119 gondolas 12 minutes
File:Línea L (Logo Metro de Medellín).svg

Line L
Northeast to far Northeast
4.8 km (3.0 mi)[2]
2 stations[1]

9 February 2010 55 gondolas 1,200 15 minutes 0:14 minutes
File:Línea H (Logo Metro de Medellín).svg

Line H
East to far Northeast
1.4 km (0.87 mi)[2]
3 stations[1]

17 December 2016 44 gondolas 1,800 5 minutes 0:13 minutes
File:Línea M (Logo Metro de Medellín).svg

Line M
East to Northeast
1.05 km (0.65 mi)[2]
3 stations[1]

28 February 2019 49 gondolas 2,500 4 minutes 0:09 minutes
File:Línea P (Logo Metro de Medellín).svg

Line P West to Northwest 2.7 km (1.7 mi)[2] 3 stations[1]

10 June 2021 138 gondolas 19 km/h (12 mph) 10 users sitting, 2 standing; for a total of 12 users per gondola 4,000 10 minutes 0:11 minutes
BRT services
File:Linea L1 (Logo Metro Medellin).png

Line 1
West to Northeast
12.5 km (7.8 mi)[2]
20 stations[1]

22 December 2011 30 gas working buses, 1 fully electric bus; for a total of 31 articulated buses 16 km/h (9.9 mph); max. speed 60 km/h (37 mph) 154 users per bus 3,270 45 minutes 2:45 minutes
File:Linea L3 (Logo Metro Medellin).png

Line 3 Southwest/Southeast

South Corridor Under development
Feeding bus services
File:Linea L2 (Logo Metro Medellin).png

Line 2
West to Northeast
13.5 km (8.4 mi)[2]
15 stations + 8 stops[1]

22 April 2013 47 gas feeding buses 13 km/h (8.1 mph); max. speed 60 km/h (37 mph) 90 users per bus 1,417 52 minutes 4:17 minutes
File:LineaOmetro-medellin.png

Line O
North to South
9 km (5.6 mi)[2]
27 stops[1]

2 December 2019 64 electric buses 13 km/h (8.1 mph); max. speed 60 km/h (37 mph) 80 users per bus 800 45 minutes 6:00 minutes
Tram services
File:Línea T-A (Logo Metro de Medellín).svg

Line T
Center to East
4.2 km (2.6 mi)[2]
3 stations + 6 stops[1]

31 March 2016 12 tramway vehicles 16 km/h (9.9 mph); max. speed 70 km/h (43 mph) 300 users per tram 3,807 19 minutes 4:44 minutes
Total
File:Línea A (Logo Metro de Medellín).svg File:Linea B (Logo Metro Medellin).svg File:Linea K (Logo Metro Medellin).svg File:Linea J (Logo Metro Medellin).svg File:Línea L (Logo Metro de Medellín).svg File:Línea H (Logo Metro de Medellín).svg File:Línea M (Logo Metro de Medellín).svg File:Línea P (Logo Metro de Medellín).svg File:Linea L1 (Logo Metro Medellin).png File:Linea L2 (Logo Metro Medellin).png File:LineaOmetro-medellin.pngFile:Línea T-A (Logo Metro de Medellín).svg 65 stations (48 stops) Oldest: File:Línea A (Logo Metro de Medellín).svg 30 November 1995

Newest: File:Línea P (Logo Metro de Medellín).svg 6 June 2021

File:Línea A (Logo Metro de Medellín).svg File:Linea B (Logo Metro Medellin).svg 240 cars

File:Linea K (Logo Metro Medellin).svg File:Linea J (Logo Metro Medellin).svg File:Línea L (Logo Metro de Medellín).svg File:Línea H (Logo Metro de Medellín).svg File:Línea M (Logo Metro de Medellín).svg File:Línea P (Logo Metro de Medellín).svg 498 gondolas File:Linea L1 (Logo Metro Medellin).png 31 articulated buses File:Linea L2 (Logo Metro Medellin).png 111 feeding buses File:Línea T-A (Logo Metro de Medellín).svg 12 tramway

Fastest: File:Línea A (Logo Metro de Medellín).svg File:Linea B (Logo Metro Medellin).svg max. speed 80 km/h (50 mph)

Slowest: File:Linea L2 (Logo Metro Medellin).png 13 km/h (8.1 mph)

Most capacity: File:Línea A (Logo Metro de Medellín).svg File:Linea B (Logo Metro Medellin).svg File:Línea T-A (Logo Metro de Medellín).svg 300 users per car/tram

Least capacity: File:Linea K (Logo Metro Medellin).svg File:Linea J (Logo Metro Medellin).svg File:Línea L (Logo Metro de Medellín).svg File:Línea H (Logo Metro de Medellín).svg File:Línea M (Logo Metro de Medellín).svg 10 users per gondola

82,502 Fastest journey: File:Línea M (Logo Metro de Medellín).svg 4 minutes

Slowest journey: File:Linea L2 (Logo Metro Medellin).png 52 minutes

Least wait time: File:Línea M (Logo Metro de Medellín).svg 0:09 minutes

Most wait time: File:LineaOmetro-medellin.png 6:00 minutes

Expansions

Metrocable

File:2018 Línea H del Metrocable entre las estaciones Las Torres y Villa Sierra - MEdellín.jpg
Line H of the Metrocable

On 7 August 2004,[5] the city inaugurated a new line known as "Metro Cable" (Line K). The line starts in the Acevedo Station and goes to the up hill district of Santo Domingo Savio.[6] This important addition integrated new additions to the city that since the 1960s that previously were not considered part of the "real city".

File:Metrocablemed1.png
Line K (Metrocable) of the Metro de Medellín.

On 3 March 2008,[5] a second "Metro Cable" line (Line J) was inaugurated. The line starts in the San Javier Station and goes through Juan XXIII and Vallejuelos to the La Aurora district.[6] This new line benefits approximately 150,000 new users. A new Metrocable line (line L) was inaugurated in 2009[5] with a transfer station at Santo Domingo Savio Station. This line continues further uphill to El Tambo[6] in Arví park near Guarne. The reason for constructing this line is because the city wants to promote tourism in the rural area near Lake Guarne. It takes 14 minutes to ascend to El Tambo and there are no intermediate stations. On June 10, 2022 there was a new "Metro Cable" line (Line P). The line starts from the Acevedo station and goes all the way to the El Progreso station, in the northwest. It takes approximately 10 minutes to go through all the stations, and it benefits 200,000 people.

Line A extension

Line A was expanded from Itagüí to La Estrella, in the south of the metropolitan area. A new intermediate station, Sabaneta, built near 67th South Street, was opened on 5 August 2012[7] and the final station, La Estrella, was built near 77th South Street and opened on 17 September 2012.[8]

Train line

In February 2020 it was announced that Medellín will reactivate the train line between Bello and Caldas.[9]

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 "Metro map" (pdf). Medellín Metro. Retrieved 16 May 2020.
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 "Metro facts" (jpg). Medellín Metro. 16 Jun 2021.
  3. "Memoria de Sostenibilidad 2020". p. 28.
  4. "Boletín Técnico Encuesta de Transporte Urbano de Pasajeros (ETUP) IV trimestre de 2021". p. 14.
  5. 5.0 5.1 5.2 "Historia" [History] (in Spanish). Metro de Medellín. 4 January 2016. Retrieved 15 January 2016.{{cite web}}: CS1 maint: unrecognized language (link)
  6. 6.0 6.1 6.2 "Metrocable - Metrocable Lines". Metro de Medellín. 15 November 2013. Archived from the original on 2015-06-10. Retrieved 16 November 2013.
  7. "ESTE DOMINGO 5 DE AGOSTO INICIA LA OPERACIÓN COMERCIAL HASTA LA NUEVA ESTACIÓN SABANETA" (in Spanish). Retrieved 5 January 2013.{{cite web}}: CS1 maint: unrecognized language (link)
  8. "ESTE LUNES 17 DE SEPTIEMBRE EL METRO INAUGURARÁ LA EXTENSIÓN AL SUR" (in Spanish). Retrieved 5 January 2013.{{cite web}}: CS1 maint: unrecognized language (link)
  9. El Colombiano. "Antioquia definió el primer tramo para reactivar su ferrocarril". Retrieved 22 February 2020.